ISS Daily Summary Report – 3/16/2021
newsdepo.com
Payloads Combustion Integrated Rack (CIR) / Advanced Combustion via Microgravity Experiments (ACME): The crew performed the steps necessary to lubricate the quick disconnect (QD) for the gas chromatograph argon gas bottle. They also replaced the N2/O2 gas botISS Daily Summary Report – 3/16/2021
Payloads Combustion Integrated Rack (CIR) / Advanced Combustion via Microgravity Experiments (ACME): The crew performed the steps necessary to lubricate the quick disconnect (QD) for the gas chromatograph argon gas bottle. They also replaced the N2/O2 gas bottle at manifold 2 and installed an ethane fuel bottle at the manifold 4 location. This was performed … Read more