ISS Daily Summary Report – 3/18/2019
newsdepo.com
Combustion Integrated Rack (CIR) Fuel Oxidizer Management Assembly (FOMA): The crew performed the FOMA calibration preparatory activities which consisted of closing and opening the appropriate valves on manifold bottles and the GIP (gas interface panel). ThISS Daily Summary Report – 3/18/2019
Combustion Integrated Rack (CIR) Fuel Oxidizer Management Assembly (FOMA): The crew performed the FOMA calibration preparatory activities which consisted of closing and opening the appropriate valves on manifold bottles and the GIP (gas interface panel). The FOMA calibration is a periodic activity required to support CIR science operations. CIR provides sustained, systematic microgravity combustion research and … Read more