ISS Daily Summary Report – 5/04/2020
newsdepo.com
SlingShot: To prepare for the Slingshot deployer installation, the crew reviewed the big picture words, then installed the slingshot heater and controller inside the Cygnus vehicle. The team is still discussing a plan for the cables which could not be conISS Daily Summary Report – 5/04/2020
SlingShot: To prepare for the Slingshot deployer installation, the crew reviewed the big picture words, then installed the slingshot heater and controller inside the Cygnus vehicle. The team is still discussing a plan for the cables which could not be connected last week. SEOPS’ SlingShot is a small satellite deployment system that fits inside the … Read more