ISS Daily Summary Report – 11/01/2018
newsdepo.com
Combustion Integration Rack (CIR) Burst Disc Removal: The crew removed the burst discs from the argon and checked gas manifolds in the CIR Gas Chromatography (GC) system. These burst discs are considered redundant with the pressure relief valves in the systISS Daily Summary Report – 11/01/2018
Combustion Integration Rack (CIR) Burst Disc Removal: The crew removed the burst discs from the argon and checked gas manifolds in the CIR Gas Chromatography (GC) system. These burst discs are considered redundant with the pressure relief valves in the system and issues with the helium burst disc have occurred in the past. Following this … Read more