Reconstructed St Dominic’s RC School Block #5 handed over
<p>Funded by the Caribbean Development Bank and executed through the Basic Needs Trust Fund Programme, the project was completed on 28 August 2026 at a cost of EC$1,435,959.56</p> View the full post <a href="https://nowgrenada.com/2026/09/reconstructed-st-dominics-rc-school-block-5-handed-over/">Reconstructed St Dominic’s RC School Block #5 handed over</a> on <a href="https://nowgrenada.com">NOW Grenada</a>.
