Circle Line reliability drops 23% in October; overall MRT network still beats 1m train-km target
Singapore's MRT network, excluding the Thomson-East Coast Line (TEL), saw its Mean Kilometres Between Failure (MKBF) dip slightly in October — falling from the record 3.38 million train-km set in September to 3.14 million train-km.But it remains well above the 1 million train-km MKBF target, while exceeding 2 million train-km for the seventh consecutive month, according to data from the Land Transport Authority (LTA)'s monthly rail reliability report.All MRT lines’ MKBF remain above one million train-km, including the oldest North-South (NSL) and East-West Line (EWL), LTA said on Thursday (Nov 19).Rail reliability is mainly tracked using a 12-month moving average of the MKBF metric, which counts the average distance a train travels before it has a delay of over five minutes.
