Tshwane drowns in R22.8bn waste
A South African Human Rights Commission report says Tshwane faces a R23bn infrastructure backlog, loses 39% of its water and has a 41% vacancy rate, while tanker costs have surged amid persistent wastewater failures.
A South African Human Rights Commission report says Tshwane faces a R23bn infrastructure backlog, loses 39% of its water and has a 41% vacancy rate, while tanker costs have surged amid persistent wastewater failures.