Electric Stations head inspects At-Bashy HPP’s readiness for winter
Ulugbek Mamyraliev, General Director of Electric Stations OJSC, inspected the progress of preparations of the At-Bashy Hydropower Plant (HPP) for the 2026–2027 autumn-winter season.
Ulugbek Mamyraliev, General Director of Electric Stations OJSC, inspected the progress of preparations of the At-Bashy Hydropower Plant (HPP) for the 2026–2027 autumn-winter season.