ISS Daily Summary Report – 9/21/2021

Payloads

Dreams: A crewmember doffed the headband upon wakeup and filled out a questionnaire. The unit was then recharged and redonned prior to sleep later in the day. Sleep plays a major role in human health and well-being. Insufficient sleep or sleep disorders can increase the risk of developing medical conditions, such as cardiovascular diseases, and can impair task performance. The Sleep Monitoring in Space with Dry-EEG Headband (Dreams) is a technology demonstration investigation that utilizes the Dry-EEG Headband: an effective, affordable, and comfortable solution to monitor astronaut sleep quality during long-duration spaceflight aboard ISS.

Microbial Tracking-3: A crewmember collected ISS surface samples while photographing each location and placed the samples into cold stowage. The Quantifying Selection for Pathogenicity and Antibiotic Resistance in Bacteria and Fungi on the ISS – a Microbial Tracking Study (Microbial Tracking-3 or MT-3) investigation continues a series focused on ongoing monitoring of pathogenicity (ability to cause disease) and antibiotic resistance in potentially disease-causing bacteria and fungi present on the International Space Station (ISS). The investigation aims to identify, analyze, and characterize pathogenicity, antibiotic resistance, and genomics to augment the NASA GeneLab with the statistical confidence to characterize microbes associated with closed habitation and predict those that may pose a threat to crew health.

Rodent Research-Demonstration 1 (RR-D1): Crewmembers performed Rodent Research Experiment 2 operations and completed the setup for Experiment 3 operations. Rodent Research-Demonstration 1 (RR-D1) validates equipment and procedures for surgical techniques related to the wound healing process. Normal skin function and wound healing are important for maintaining good health, but spaceflight may impair healing of wounds in astronauts.  Results from this investigation are intended to support design of a subsequent study on the effects of spaceflight on wound healing.

Systems

In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Pre-Treat Tank Remove & Replace (R&R): The crew R&R’d the Pre-Treat Tank as part of nominal WHC preventative maintenance. Each tank contains five liters of pre-treat solution; a mix of acid, chromium oxide, and water, used for toilet flushing and required for nominal WHC operation.

Portable Breathing Apparatus (PBA) Tether Repair: The crew repaired and secured the QD clip tethers on the PBA cylinder assembly. PBAs are stowed in specified locations throughout the U.S. and international modules and provide breathable O2, eye/nose/mouth protection, and two-way communications to a crewmember during a fire, rapid depressurization, or toxic spill event.

Acoustic Monitoring:  Crew-worn acoustic monitors were set up and distributed to two crewmembers onboard the ISS and used to take sound measurements experienced by the crew. The acoustic monitoring sessions gather data to characterize any changes to the acoustic environment throughout the station.

Completed Task List Activities:

  • None

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Mobile Servicing System (MSS) powerup
  • Special Purpose Dexterous Manipulator (SPDM) Materials on ISS Experiment (MISSE) Sample Carrier (MSC) Demate and Relocate
  • Atmosphere Revitalization System (ARS) Thermal Amine Scrubber (TAS) Activation
  • Japanese Experiment Module Remote Manipulator System (JEMRMS) EFU Adapter Transfer to JEMAL

Look Ahead Plan

Wednesday, September 22 (GMT 265)
Payloads:

  • Astrobee Off (NASA)
  • CIR Manifold-4 Bottle Replace (NASA)
  • Dreams Headband DOFF, data xfer and stow (ESA)
  • Food Acceptability (NASA)
  • Industrial Crystallization Facility (ALT) stow (NASA)
  • ISS Experience Z-CAM final stow (NASA)
  • Microbial Tracking 3 Sample Collect (NASA)
  • MSL Low Grade Furnaces Sample Cartridge Removal (ESA)
  • RR-D1 Experiment setup and Hab Restock and Access Unit Clean (NASA)
  • SOLISS Removal (JAXA)

Systems:

  • Environmental Health System (EHS) Acoustic Monitor Setup
  • Environmental Health System (EHS) – Microbial Capture Device (MCD) and Coliform Water Sample Analysis 44 +/- 4 hours post processing
  • Dragon cargo ops
  • Crew Dragon Tablet Sync

Thursday, September 23 (GMT 266)
Payloads:

  • BIOMOLE ops part 3 (NASA)
  • EarthKAM 85mm Lens Change (NASA)
  • Eklosion Message and Photo (ESA)
  • ESA EPO- Touch Surface (ESA)
  • Lumina Data Transfer (ESA)
  • Microbial Tracking 3 Sample Collect (NASA)
  • RR-D1 3A Biopsy (NASA)
  • STaARS BS12 Sample Removal and MELI insert (NASA)
  • Standard Measures Presleep Questionnaire (NASA)

Systems:

  • Soyuz (64S) redocking training
  • Extravehicular Activity (EVA) Battery Operations Terminal Charge Terminate
  • Dragon cargo ops

Friday, September 24 (GMT 267)
Payloads:

  • BIOMOLE MinION hardware stow (NASA)
  • EarthKAM Node 2 Shutdown and stow (NASA)
  • Food Acceptability (NASA)
  • HRF1 PC1 Troubleshoot (NASA)
  • ISS HAM pass (NASA)
  • Microbial Tracking 3 Sample collect with video (NASA)
  • Mochii Hardware removal (NASA)
  • PILOTE VR Troubleshoot (ESA)
  • RR-D1 3B Biopsy (NASA)
  • Standard Measures Postsleep Questionnaire (NASA)
  • Thermal Amine Sampling (NASA)

Systems:

  • In-Flight Maintenance (IFM) Floating Potential Measurement Unit (FPMU) Disassembly
  • Dragon cargo ops

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Medical equipment closeout
  • Microbial Tracking-3 Environmental Sample Collection
  • Repair PBA Tethers
  • Acoustic Monitor Setup for Crew Worn Measurements
  • EarthKAM Troubleshooting
  • Cargo Transfer to Dragon
  • In Flight Maintenance (IFM) Thermal Amine Scrubber (TAS) Desiccant Wheel (DESWHL) Remove and Replace (R&R)
  • In Flight Maintenance (IFM) Thermal Amine Scrubber (TAS) Shell Replace (RPLC)
  • In Flight Maintenance (IFM) Thermal Amine Scrubber (TAS) Locker Replace (RPLC)
  • Rodent Research Experiment 2
  • Remove Toilet Pretreat Tank
  • In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Pre-Treat Tank Remove & Replace
  • Extravehicular Activity (EVA) Battery Operations Terminal Charge Terminate
  • COL PAYLOAD LAPTOP 2 Software Load
  • Extravehicular Activity (EVA) Battery (BATT) Removal
  • EVA Battery Operations Terminal Charge Init
  • In-Flight Maintenance Thermal Amine Scrubber Power-up
  • Photo TV Battery Charge Deactivation
  • FRIDGE2 TROUBLESHOOTING
  • Crew Alternate Sleep Accommodation Light Test
  • Acoustic Monitor Battery Swap
  • LSG Secondary Crew Restraint Fold
  • LSG Primary Crew Restraint Fold
  • Dragon Polar 6 Rattling Noise Troubleshooting
  • Dreams Dry-EEG Headband Setup