ISS Daily Summary Report – 3/05/2019

Life Support Rack (LSR): Today a crewmember removed the Waste Water Filter insert element from the LSR and prepared the element for return. LSR is a Technology Demonstrator for Closed Loop Air Revitalization. It captures carbon dioxide from cabin air and recovers 50% of its oxygen for use by the astronauts. LSR will operate for a minimum of one year on the ISS to demonstrate the robustness of the technology for future Exploration Missions.

Plasma Krystall-4 (PK-4): Today a crewmember initiated three runs as part of group 1 sequences and then reconfigured the PK-4 hardware for Neon Gas use. PK-4 is a scientific collaboration between the ESA and the Roscosmos, performing research in the field of “Complex Plasmas”: low temperature gaseous mixtures composed of ionized gas, neutral gas, and micron-sized particles.

Combustion Integrated Rack (CIR): Today a crewmember replaced the Manifold #2 O2/N2 bottle in preparation for upcoming CIR runs. The CIR includes an optics bench, combustion chamber, fuel and oxidizer control, and five different cameras for performing combustion experiments in microgravity.

Emergency Onboard Training: All three crewmembers performed refresher training in order to practice and evaluate the ability to communicate with the ground teams from the Soyuz while wearing Emergency Masks

Extravehicular Activity (EVA) Preparations: The crew continued EVA preparations by resizing EMU 3008 for use by Ann McClain. They installed and checked out Rechargeable EVA Battery Assemblies (REBA) on EMUs 3003 and 3008.  In addition, they inspected the Load Alleviating Straps on Safety Tethers, Waist Tethers and soft straps on D-Ring Extenders. The P4 Integrated Equipment Assembly (IEA) Channels 4A and 2A Battery EVAs are planned for March 22 and 29.

Major Constituent Analyzer (MCA) Replacement: The crew removed the MCA Orbital Replacement Unit (ORU)-2 within the LAB1D6 location today. This unit experienced an ion pump short and failed in December 2018 and will be returned to the ground for refurbishment via SpaceX-17, currently planned for April of this year. The MCA is a mass spectrometer based system that measures the major atmospheric constituents on the ISS.

Completed Task List Activities:

  • None

Ground Activities:
All activities are complete unless otherwise noted.

  • Crew Dragon Survey utilizing SSRMS

Look Ahead:  

Wednesday, 03/06 (GMT 065):
Payloads:

  • SODI – Alt DSC stow (ESA)
  • Circadian Rhythms Don Ops (ESA)
  • SUBSA Hardware Gather (NASA)
  • PK4 Runs 2/1-3 and HD Exchange (RUS)

Systems:

  • Crew Dragon Cargo Operations
  • 57S Emergency Drill

Thursday, 03/07 (GMT 066):
Payloads:

  • Standard Measures Questionnaires (NASA)
  • BCM Questionnaires (NASA)
  • SUBSA H/W Setup (NASA)
  • MELFI Ice-Brick xfer (NASA)
  • Microscope H/W teardown (NASA)
  • ISS Experience Lab setup (NASA)
  • PK4 data xchng  and chamber gas xchng (NEON) and Runs 3/1-3 (RUS)

Systems:

  • Crew Dragon Cargo Operations
  • Crew Dragon Egress and Hatch Closure

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • MegaHEPA Seal Remove
  • Regeneration of БМП Ф2 Micropurification Cartridge (start)
  • Countermeasures System (CMS) Advanced Resistive Exercise Device (ARED) Cylinder Flywheel Evacuation
  • Integrated Emergency Procedure Review
  • Environmental Health System (EHS) Potable Water Dispenser (PWD) Sample Collect
  • Extravehicular Mobility Unit (EMU) Resize
  • PK-4 Experiment Run 1/1
  • Rechargeable EVA Battery Assembly (REBA) Installation
  • Manufacturing Device Locker Move
  • Rechargeable EVA Battery Assembly (REBA) Powered Hardware Checkout
  • Electrostatic Levitation Furnace(ELF) Cable Troubleshooting.
  • ISS HAM Service Module Pass
  • СОЖ Maintenance
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • Environmental Health System (EHS) Coliform Water Processing
  • Recharging Soyuz 741 Samsung PC prior to OBT, start recharge
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Potable Water Dispenser (PWD) Sample Analysis
  • PK-4 Experiment Run 1/2
  • PK-4 Experiment Run 1/3
  • SpaceX Demo-1 Window Overview Inspection
  • Combustion Integrated Rack Upper Rack Doors Open
  • Combustion Integrated Rack Manifold #2 Bottle Replacement
  • Food Acceptability Questionnaire
  • Removal of Waste Water Filter insert
  • In Flight Maintenance (IFM) Mass Constituents Analyzer (MCA) Orbital Replacement Unit (ORU) 2 Removal
  • Combustion Integrated Rack Upper Rack Doors Close
  • Solidification Using Baffles in Sealed Ampoules OBT
  • Recharging Soyuz 741 Samsung PC prior to OBT, remove from recharge
  • EVA Crew Tether Inspection
  • Food Acceptability Questionnaire
  • PK-4 Chamber filling with Neon gas
  • Atmospheric Control System (ACS) Nitrogen Oxygen Recharge System (NORS) Oxygen Transfer
  • Dragon Rendezvous/docking Debrief Conference
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record
  • Actiwatch Plus Evaluation Display Check
  • In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Pre-Treat Tank Remove & Replace
  • EVA Crew Tether Inspection
  • Delta File Prep
  • ALBEDO. Setup, VSS Imagery, Closeout Ops
  • iPad 58 Soyuz Crew Preparation