ISS Daily Summary Report – 3/03/2019

SpaceX (SpX) Crew Dragon Demonstration 1:  On Saturday, SpX Crew Dragon successfully launched from Kennedy Space Center (KSC) atop a Falcon 9 Block 5 rocket at 1:49 AM CT.  On Sunday, the vehicle successfully performed an autonomous rendezvous and docking onto the Node 2 forward International Docking Adapter (IDA). Soft capture occurred at 4:51 AM CT and hard mate was accomplished at 5:02 AM CT. Once docked, the Crew performed pressure checks, opened hatches, then ingressed the vehicle and took samples of the atmosphere. This uncrewed flight test marks a significant step towards returning capability to launch astronauts on a U.S. built spacecraft from U.S. soil. Undocking and splashdown in the Atlantic Ocean is planned for March 8.

Completed Task List Activities:

  • None

Ground Activities:
All activities are complete unless otherwise noted.

  • ISS configuration in support of SpX Crew Dragon Docking

Look Ahead:  

Monday, 03/04 (GMT 063):
Payloads:

  • ISS Experience
  • PK-4

Systems:

  • EMU OFV

Tuesday, 03/05 (GMT 064):
Payloads:

  • PK-4
  • CIR Manifold Bottle Swap
  • LSR Waste Water Filter Exchange

Systems:

  • Integrated Emergency Procedure Review
  • WHC Pre-Treat Tank Replace

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Dragon Forward- Crew C2V2 Command Test
  • Robotic Workstation (RWS) Setup
  • Dragon Forward ISS Video Setup
  • Cupola Window Shutter Close
  • ISS RS and Soyuz-741 Prep for Expected Off-Nominal Situation during SpX Demo-1 Docking to ISS
  • Dragon Forward Approach Monitoring
  • Open the Lab Forward hatch after docking is complete.
  • On MCC Go. Transition of ISS RS and Soyuz №741 to initial condition after SpX Demo-1 docking to ISS
  • Perform leak check of PMA after Dragon docking
  • Node 2 to Dragon Pressurization and Leak Check
  • Node 2 to Dragon Final Pressurization and Vestibule prep for Ingress
  • СОЖ Maintenance. FGB Water Supply System [СВО], Sanitary and Hygiene Equipment (СГО), Urine Collection and Pretreat Assembly (СПКУ) [АСУ] Counter, POTOK Air Purification System Data Call downs
  • ИПК-1М preparation for the first ingress into SpX Demo-1
  • Dragon-2 (SpX Demo-1) Air Sampling using АК-1М sampler prior to Air Duct Installation
  • SM atmosphere analysis using Freon Leak Analyzer/Detector (ФИТ)
  • Node 2 to Dragon Ingress
  • First Video Inside of Dragon after the Hatches are Open
  • Public Affairs Office Welcome Event for Crew Dragon
  • Dragon Arrival Photos
  • First Video Inside of Dragon after the Hatches are Open
  • Public Affairs Office (PAO) Event in High Definition (HD) – Node 2
  • Dragon Forward Docking Kit Stow
  • Dragon Monitoring Tools Teardown
  • Systems Operations Data File (SODF) Deploy
  • Dragon MegaHEPA Seals Install