ISS Daily Summary Report – 2/22/2019

SpaceX Demo-1 Dragon2 Training: The crew utilized a computer based trainer and reviewed procedures to refresh themselves with Dragon2 systems, rendezvous and docking, ingress operations, changes to emergency responses, and vehicle departure. SpaceX Demo-1 mission is the first unmanned demonstration flight to the ISS for the Dragon2 spacecraft. The vehicle is planned to launch from KSC atop of a Falcon 9 Block 5 rocket on March 2 at 1:48AM CT. An autonomous rendezvous and docking with manual override ability is set to occur the following day on March 3. Undocking and splashdown in the Atlantic Ocean is planned for March 8. This unmanned demonstration flight will set the stage for crewed missions in the future.

Fluids Integrated Rack (FIR) Light Microscopy Module (LMM) Biophysics: Today a crewmember accessed the FIR/LMM and examined the Auxiliary Fluids Container to assess damage of the Biophysics Plate 3 capillaries and to provide the ground with photography. Proteins are important biological molecules that can be crystallized to provide better views of their structure, which helps scientists understand how they work. Proteins crystallized in microgravity are often higher in quality than those grown on Earth. The Effect of Macromolecular Transport on Microgravity Protein Crystallization studies why this is the case, examining the movement of single protein molecules in microgravity.

CIR (Combustion Integrated Rack): Today a crewmember performed O2 bottle exchanges in the CIR rack facility Manifold 2 and 4 in preparation for upcoming test runs. The CIR includes an optics bench, combustion chamber, fuel and oxidizer control, and five different cameras for performing combustion experiments in microgravity. 

JEM Regenerative Heat Exchanger (RHX) Hose Insulator Installation:  Today, the crew installed an insulator to the JEM RHX hose to prevent condensate water from accumulating. Last July, the crew observed approximately 200 mL of water on the flex hose connected to the RHX within the JEM starboard endcone. The new hose insulator was subsequently manifested and flown onboard Northrop Grumman (NG)-10.

Completed Task List Activities:

  • None

Ground Activities:
All activities are complete unless otherwise noted.

  • SPDM Stow and SSRMS walk off to MBS PDGF 4 (planned this evening)

Look Ahead:  

Saturday – Sunday (GMT 054-55) – Crew Off Duty
Payloads:

  • None

Systems:

  • Node 2 Smoke Detector Repair (GMT 054)

Monday, 02/25 (GMT 056):
Payloads:

  • ISS HAM (NASA)

 Systems:

  • C2V2 R3 Software Update

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • ISS Crew and ГОГУ (RSA Flight Control Team) weekly conference
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Part 1 and 2
  • CARDIOVECTOR. Experiment Session
  • Removal of Navigation Module [НМ-2] from Progress 440 [AO]
  • MELFI 2 Rack Preparation
  • JEM RHX Insulator Installation
  • Preparation for Wide-Band Communication System (ШСС) equipment installation in SM (clearing space behind SM panels 339, 460, 461, 462, 464)
  • In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Full Fill
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • RR-HW-LOCATE
  • Metal Oxide (METOX) Regeneration Termination
  • In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Full Fill
  • MELFI-2 Rack Reconfiguration
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • Station Support Computer 24 Troubleshooting
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • Combustion Integrated Rack Upper Rack Doors Open
  • Combustion Integrated Rack Manifold #2 Bottle Replacement
  • On-Board Training (OBT) SpX-DEMO1 OBT Kickoff Conference
  • SpX-DEMO1 Vehicle Ops
  • Combustion Integrated Rack Manifold #4 Bottle Replacement
  • SpX-DEMO1 OBT procedure review and CBT
  • Combustion Integrated Rack Upper Rack Doors Close
  • On-Board Training (OBT) SpX-DEMO1 OBT Conference after procedure review
  • Fluids Integrated Rack Rack Doors Open
  • HRF Rack 2 Supply Kit Inventory
  • LMM AFC INSPECT
  • Routine Maintenance of H2O [КВ], Air Pressure [КН], and Drainage [КД ]Valves in SM Rodnik Tanks
  • Maintenance Closures of Vozdukh Valves
  • СОЖ maintenance
  • Fluids Integrated Rack Doors Close
  • ISS Experience Hardware Stow
  • ISS CREW/CSA CONFERENCE
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Fill Part 3
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill