Northrop Grumman (NG-10) Cygnus Release: Today, Crew and ground teams utilized the Space Station Remote Manipulator System (SSRMS) to unberth the S.S. John Young from Node 1 nadir then released the vehicle at 1616 GMT (10:16 AM CT). This completes eighty-one days of joint ISS/Cygnus operations. Now that Cygnus has departed the ISS, it will be performing several small satellite deployments and operations for other agencies before re-entering the Earth’s atmosphere over the South Pacific on February 25.

Meteor: Today a crewmember swapped out the Meteor laptop AMS hard drive. The Meteor payload is a visible spectroscopy instrument used to observe meteors in Earth orbit. Meteor uses image analysis to provide information on the physical and chemical properties of the meteoroid dust, such as size, density, and chemical composition. The study of the meteoroid dust on orbit provides information about the parent comets and asteroids.

Actiwatch Spectrum: Today a crewmember linked the Actiwatch Spectrum hardware to the HRF1 rack to allow ground teams to download stored data. The Actiwatch Spectrum is a waterproof, nonintrusive, sleep-wake monitor worn on the wrist of a crewmember. The device contains an accelerometer for measuring motion and color sensitive photodiodes (a photodetector capable of converting light into voltage) for monitoring ambient lighting. Together, these capabilities enable the Actiwatch Spectrum to be used to analyze circadian rhythms, sleep-wake patterns, and activity.

Simplified Aid for EVA Rescue (SAFER) Test Module Checkout: Crew performed a check out of SAFER 1015 and Test Module seals. The activity measured regulator pressure under flow and no-flow conditions, performed a leak check, and measured the relief valve crack and reseated pressure to satisfy two year on-orbit maintenance requirements.

Completed Task List Activities:

  • None

Ground Activities:
All activities are complete unless otherwise noted.

  • Cygnus departure

Three-Day Look Ahead:  

Saturday, 02/09 – Crew Off-Duty
Payloads:

  • ISS Experience Node 2 Astronaut Log (NASA)

Systems:

  • None

Sunday, 02/10 – Crew Off-Duty
Payloads:

  • No crew activities

Systems:

  • None

Monday, 02/11
Payloads:

  • Food Acceptability (NASA)
  • Astrobee Install Prep(NASA)
  • LMM/Biophysics 2/5 Plate 3 insert (NASA)

Systems:

  • EMU Flush
  • Max CEVIS

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Actiwatch Spectrum HRF Rack 1 Setup
  • Actiwatch Spectrum HRF Rack 1 Stow
  • Record video for CSA about physical activity in space
  • Cygnus PCS Command and PROX Link Verification
  • Acoustic Monitor Data Transfer and Stow
  • Environmental Health System (EHS) – Coliform Water Sample Analysis 44 +/- 4 hours post processing
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis and Record
  • Review H-Bolt Info to prep for Battery EVA
  • Extravehicular Activity (EVA) Training Review
  • Simplified Aid For EVA Rescue (SAFER) Checkout
  • Internal Thermal Control System (ITCS) Fluid System Servicer (FSS) Coolant Refill of JEM – Procedure Review
  • Delta file prep
  • ISS Experience Message Review
  • JEM Payload Laptop Terminal 3 (PLT3) Communication error Troubleshoot
  • Lighting Effects Sleep Log Entry Subject
  • MELFI 1 Ice Brick Insert 3
  • MELFI 2 Ice Brick Insert 1
  • MELFI 3 Ice Brick Insert 3
  • Meteor Hard Drive Swapout
  • Mouse Habitat Unit (MHU) Experiment Laptop Terminal 2 (ELT2) Setup
  • Ghost camera setup in Cupola
  • Robotic Workstation (RWS) High Definition (HD) Monitor Downlink
  • Robotic Workstation (RWS) High Definition (HD) Monitor Deactivation
  • PCS Laptop Relocate
  • Pressure Managmenet Device (PMD) N1 Deck MPEV close
  • Pressure Management Device (PMD) Equipment Teardown
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Part 2
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Remove and Replace
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • Robotic Workstation (RWS) Teardown
  • Space Station Remote Manipulator System (SSRMS) Cygnus Release
  • USOS Window Shutter Close
  • Monitoring cover closure on windows 6, 8, 9, 12, 13, 14. Note 12
  • SCENARIO. Observation and photography using Photo Equipment
  • Photographing of RS modules.
  • Weekly monitoring of video recording equipment performance on the ISS RS
  • TV System deactivation and closeout ops
  • Camcorder setup and activation for TV coverage of Oscillography of Air Conditioner Unit [СКВ2] compressor inrush current
  • Photography of ТП228 dummy thermal sensors on the external surface of MRM2
  • ABOUT GAGARIN FROM SPACE. Hardware Setup and Activation.  Note 9
  • Audit of disposable covers for Low-Noise Headsets ГНШ-К-24
  • СОЖ maintenance
  • Oscillography of Air Conditioner Unit [СКВ2] Compressor Inrush Current
  • ТГК 71P transfer operations