ISS Daily Summary Report – 6/05/2018

Electro-static Levitation Furnace (ELF):  Today the crew exchanged the sample holders to prepare for upcoming ground commanded operations in the ELF.  ELF is an experimental facility designed to levitate, melt and solidify materials by containerless processing techniques using the electrostatic levitation method.  With this facility thermophysical properties of high temperature melts can be measured and solidification from deeply undercooled melts can be achieved. 

Plant Habitat-1:  To prepare for Plant Habitat-1 operations the crew changed Ethylene and CO2 scrubbers, the CO2 Bottle, and inlet and outlet filters, and prepared the facility for the Science Carrier installation.  Plant Habitat is a fully automated facility that will be used to conduct plant bioscience research on the ISS. The space environment is stressful for all living organisms. Understanding how plants respond will help crews on future missions successfully grow plants for food and oxygen generation. The Plant Habitat-1 investigation compares differences in genetics, metabolism, photosynthesis, and gravity sensing between plants grown in space and on Earth.  This investigation is expected to provide key insights on major changes occurring in plants exposed to microgravity. 

ICE Cubes Facility (ICF):  The crew installed the Ice Cubes facility in the European Physiology Module (EPM) rack today.  The ICF provides a simplified, low-cost access service to the ISS for commercial entities.  It supports investigations contained in individual Experiment Cubes. 

Extravehicular Activity (EVA) Preparations: In preparation for US EVA 51, Node 2 (N2) Forward External Wireless Communications (EWC) install, the crew assembled the Worksite Interface Fixtures (WIF) #16 and #17.  Once assembled, the crew performed a pull test of External High Definition Camera (EHDC) S/N 1002 on WIF #16 and verified proper latching prior to the EVA.  Both WIF booms will support new High Definition Cameras and bring additional External Wireless Communications (EWC) capabilities on N2.  

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Treadmill 2 (T2) Exercise Video Equipment Setup
  • XF305 Camcorder Setup
  • Electrostatic Levitation Furnace(ELF) sample Cartridge Retrieval
  • EML Gas Valves Opening
  • Electrostatic Levitation Furnace(ELF) sample Cartridge Cleaning
  • Electrostatic Levitation Furnace(ELF) Sample Holder Exchange
  • Ice Cubes Facility installation into EPM rack
  • Electrostatic Levitation Furnace(ELF) sample Cartridge Installation
  • EML Sample Chamber Valve opening
  • A/L Adapter Plate (JCAP) Gather and Inspection
  • Spaceflight Cognitive Assessment Tool for Windows (WinSCAT) Test
  • EVA Boom Assembly
  • СОЖ maintenance
  • Plant Habitat-01 Facility Preparation Procedure Review
  • External High Def Camera (EHDC) Boom Pull Test
  • Plant Habitat-01 Facility Prep Gather
  • Plant Habitat-01 Dual MWA Preparation
  • Systems Operations Data File (SODF) EMER-1B Books (3) Deploy
  • Remove Satellite Operations Review
  • Plant Habitat-01 Facility Preparation
  • Wastewater Storage Tank Assembly (WSTA) Fill
  • Photo/TV Camcorder Setup Verification
  • Treadmill 2 (T2) Exercise Video Equipment Stow

Completed Task List Activities:

  • None 

Ground Activities:
All activities are complete unless otherwise noted.

  • Lab MCA Zero Calibration

Three-Day Look Ahead:

  • Wednesday, 06/06: 55S launch, REMDEB Setup & Install on Slide Table, Plant Habitat Water Fill, SABL2 troubleshooting, Wireless Compose Install, ATOMIZATION Syringe Swap
  • Thursday, 06/07: EVA tool config, EVA procedures review, REBA checkout, HRF2 inventory
  • Friday, 06/08: 55S docking, BIOLAB glove exchange, EVA tool config, EVA GoPro setup, ISS Safety Briefing, Plant Habitat -1 Science Carrier Install

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Operate

Major Constituent Analyzer (MCA) Node 3

Idle

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Process

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off