ISS Daily Summary Report – 5/04/2018

SpaceX (SpX)-14 Dragon Departure Preparation: Early this morning, the crew completed re-packing of the Double Coldbags required for return of temperature-controlled items on Dragon.  The crew also transferred the remainder of cargo into the Dragon F4 location before they loaded the Dragon Center Stack. Once the cargo was loaded the crew removed power connections, utility jumpers and completed closeout of the Dragon vehicle prior to depressurization of the Node 2 (N2) Nadir vestibule.  Robotics ground controllers used the Space Station Remote Manipulator System (SSRMS) to unberth Dragon and are maneuvering Dragon to an overnight park position in preparation for tomorrow’s release at ~8:24 AM CDT. Dragon is scheduled to splashdown in the Pacific Ocean at 2:02 PM CDT tomorrow afternoon.  

Probiotics: Today a crewmember collected saliva samples and stowed them in a Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI).  He also completed a questionnaire. Some species of harmful bacteria such as Salmonella grow stronger and more virulent in the microgravity environment of space. At the same time, the human immune system is weaker in space, leading to increased health risks. The objective of the Probiotics investigation is to study the impact of continuous consumption of beneficial bacteria (probiotics) on immune function and intestinal microbiota in astronauts in a closed microgravity environment.  The results of this investigation may be used to support improvements in crew members’ intestinal microbiota and their immune function on long-duration space missions. 

Space Headaches:  Two 53S crewmembers completed a weekly questionnaire for the ESA Space Headaches investigation today. This investigation collects information that may help in the development of methods to alleviate associated symptoms and improve the well-being and performance of crewmembers in space. Headaches during space flight can negatively affect mental and physical capacities of crewmembers that can influence performance during a space mission.

Mobile Servicing System (MSS) Operations:  Yesterday, the Robotics Ground Controllers powered up the MSS and maneuvered the Special Purpose Dexterous Manipulator (SPDM) Body Roll Joint (BRJ) and Arm1 as required to perform SPDM Arm1 Wrist, Elbow and Shoulder Joints Direct Drive Tests to support trending of mechanism health. At the end of the Arm1 tests, they maneuvered SPDM Arm1 to a stow configuration and performed the BRJ Direct Drive Tests on the SPDM Body Redundant String. Finally the Robotics Ground Controllers maneuvered the BRJ to a stow configuration. 

Today’s Planned Activities
All activities are complete unless otherwise noted.

  • Probiotics Saliva Operations
  • Probiotics Salive Sample MELFI Insertion
  • Probiotics Question
  • KMA-01 and KMA-TM adapter post-installation checkout
  • Fruit Fly Lab-03 Hardware Return
  • Multi-use Variable-g Platform Module Removal
  • Cold Stowage Double Coldbag Pack
  • Cargo transfer to Dragon
  • СОЖ maintenance
  • Adjustment of БД-2 treadmill tension carriage position
  • Dragon F4 Load Assist
  • PROFILAKTIKA-2. Preparation for the Experiment.
  • Double Coldbag Transfer to Dragon
  • PROFILAKTIKA-2.Experiment Ops on БД-2 Treadmill 
  • Dragon/Node 2 VESTIBULE DEPRESS SETUP
  • PROFILAKTIKA-2.Closeout Ops.
  • VIZIR. Preparation Steps.
  • PROFILAKTIKA-2.Hygiene Procedures
  • Transfer Center Stack to Dragon
  • Extravehicular Activity (EVA) QD Training Review
  • СТТС Reconfiguration in MRM1
  • SEPARATION. Activation of the 5th distillation.
  • Dragon Cargo Operations Conference
  • Dragon Egress in Preparation for Departure
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • PLUTO Conference
  • Common Berthing Mechanism (CBM) Controller Panel Assembly (CPA) Rotation, Installation, and Closeout
  • SEPARATION. Activation of the 6th distillation.
  • Dragon Vestibule Configuration for Demate
  • Symbolic
  • VIZIR. Closeout Ops
  • Dragon/Node 2 VESTIBULE DEPRESS
  • PAO Preparation
  • Audio-session with participants of the Russian-French Conference Man and Space: Art, Science, Culture (S-band)
  • SEPARATION. Concluding Distillation. Log-file downlink.
  • USOS Window Shutter Close
  • Space Headaches – Weekly Questionnaire
  • Inventory Management System (IMS) Conference
  • SEPARATION. Sampling of collected water
  • Comm reconfig for nominal ops

Completed Task List Activities

  • Handover Questionnaire

Ground Activities
All activities are complete unless otherwise noted.

  • Battery 3B3 Capacity Test
  • Dragon Unberth and Overnight Park 

Three-Day Look Ahead:

  • Saturday, 05/05: Housekeeping, Dragon Release, Crew Off-Duty
  • Sunday, 05/06: Crew Off-Duty
  • Monday, 05/07: EMU OFV, EHS sample analysis, COL VCA1 Camera R&R, EVA LLB, CIR Optics Bench, Vascular Echo 

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Operate

Carbon Dioxide Removal Assembly (CDRA) Node 3

Standby

Major Constituent Analyzer (MCA) Lab

Operate

Major Constituent Analyzer (MCA) Node 3

Idle

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off