ISS Daily Summary Report – 5/03/2018

Miniature Exercise Device (MED-2):  The MED-2 session planned for today was postponed due to time constraints.

SpaceX-14 Cold Stowage:  The crew implemented changes in the cold stowage plan today to support the return of blood samples on the SpX-14 vehicle. 

Extravehicular Mobility Unit (EMU) Loop Scrub and Conductivity Test:  As part of the preparation activities needed to support the upcoming US EVA Pump Flow Control System (PFCS) Relocate currently planned on May 16th, the crew performed EMU water loop scrubs and tested water samples for conductivity.  During the maintenance activities, the crew noted that EMU 3006 was making an unexpected noise.  While suit telemetry appeared nominal, and no hardware issues were noted throughout the activities, a recording of the anomalous sound was provided to engineering teams for review. 

External TV Camera Group (ETVCG) Assembly: Today the crew completed assembly of an ETVCG for use in the upcoming US EVA on 16-May. This new ETVCG was constructed using the Light Assembly that was recently repaired by the crew on-orbit.  Despite multiple attempts, the crew was unable to confirm full engagement of the locking mechanism that holds the External High Definition Camera (EHDC) onto the Color TV Camera (CTVC). Engineering teams are currently reviewing photos and ground test data to determine whether or not additional action is required prior to the EVA.

Zero-Gravity Stowage Rack (ZSR) Photography: In preparation for installation of the Life Sciences Glovebox (LSG) arriving on HTV-7, the crew took specialized photos of the ZSR rack, and surrounding structure, at the JPM1F5 location. Ground specialists will use these photos to verify that on-orbit rack clearances match engineering models using a technique known as Photogrammetry.  Fundamentally, photogrammetry is about measurement: the measuring of the imaged object. The process involves taking overlapping photographs of an object and converting them into 2D or 3D digital models. By including objects of known length in the photographs, 3D models can be generated with a known scale. The results of this work will directly affect the verification and development of hardware required to install LSG later this year.

Today’s Planned Activities
All activities are complete unless otherwise noted.

  • Cargo Transfer from Dragon
  • Cell Biology Experiment Facility (CBEF) Mouse Habitat Cage Unit Installation for Micro-G and 1G
  • Extravehicular Mobility Unit (EMU) Cooling Loop Maintenance Scrub Initiation
  • Correction of lettering on the painted surface of Quick Release Screw Clamps (ЗВБ) No.3 installed on SM Aft – Progress 438 Interface
  • PROBOY. Connecting Acoustic Signal Converter Unit (БПАС) cable and activation of БПАС
  • TangoLab-1 Card Cube Replace
  • PROBOY. Software Update.
  • Cleaning FGB ЦВ1 Circulation Fan Screens
  • СОЖ maintenance
  • Vacuum Cleaning ВД1 and ВД2 air ducts in MRM2
  • PROFILAKTIKA-2. Preparation for the experiment.
  • Water Recovery and Management Condensate Pumping Init
  • PROFILAKTIKA-2.Operator Assistance in Preparation for the Experiment
  • Portable Fan Assembly Restow and Inspect
  • In-flight Maintenance (IFM) External Television Camera Group (ETVCG) Gather
  • Water Recovery and Management Condensate Pumping Term
  • PROFILAKTIKA-2. Experiment Ops on БД-2 Treadmill (Individual strategy test).
  • Extravehicular Mobility Unit (EMU) Post Scrub Cooling Loop Water (H2O) Sample
  • PROFILAKTIKA-2.Closeout Ops.
  •  External Television Camera Group Assist
  • External Television Camera Group (ETVCG) Assemble
  • EVA Extravehicular Mobility Unit (EMU) Cooling Loop Scrub Deconfiguration
  • Preventive Maintenance of FS1 Laptop
  • ZSR Rack Front Stowage Relocate
  • BRI Monthly Maintenance Note 6
  • PROFILAKTIKA-2. Hygiene Procedures
  • High Definition Video Camera Assemby 2 Activation in High Definition Mode [Aborted]
  • External Television Camera Group (ETVCG) Light Bulb R&R and Assembly Restow
  • Probiotics Item Gathering
  • СТТС Reconfiguration in MRM1
  • PWS1 booting in safe mode [Aborted]
  • SEPARATION. ЕДВ-У replacement. 
  • SEPARATION. Activation of the 4th distillation.
  • IMS Update
  • HDVCA2 SD setting and PWS1 power off post PWS1 Troubleshooting [Aborted]
  • Miniature Exercise Device Operations Session
  • ZSR and JPM1F5 Photos
  • CONTENT. Experiment Ops
  • SEPARATION.
  • Environmental Health System (EHS) – Rad Detector Relocate
  • PROBOY. RSЕ1 Laptop Ops.
  • PROBOY. Penetration Simulator Ops. 
  • Extravehicular Mobility Unit (EMU) Conductivity Test
  • ISS HAM Service Module Pass
  • SEPARATION. Log-file downlink
  • SEPARATION. Replacement and ЕДВ-Д Water Sample Collection.
  • СТТС reconfiguration in MRM1
  • PROBOY. Copy and Downlink Data
  • ISS HAM Service Module Pass
  • HRF ZBook Retrieve
  • Symbolic Activity (Setup)
  • TangoLab-1 Card Cube Remove
  • Cargo transfer to Dragon
  • ZSR and JPM1F5 Photos Part 3
  • ZSR Photos Restow
  • Stow Syringes used in H2O Conductivity Test

Completed Task List Activities

  • None 

Ground Activities
All activities are complete unless otherwise noted.

  • Battery 3B2 Capacity Test 
  • SPDM Direct Drive Testing 

Three-Day Look Ahead:

  • Friday, 05/04: Dragon Double Cold Bag Repack, Dragon Center Stack Transfer, Dragon Egress and Closeout
  • Saturday, 05/05: Housekeeping, Dragon Release Operations
  • Sunday, 05/06: Crew Off-Duty 

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Operate

Carbon Dioxide Removal Assembly (CDRA) Node 3

Standby

Major Constituent Analyzer (MCA) Lab

Operate

Major Constituent Analyzer (MCA) Node 3

Idle

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off