ISS Daily Summary Report – 4/03/2018

SpaceX-14 Status: SpaceX has completed the CUCU Broadcast Test and configured CUCU and Dragon UHF for rendezvous.  The Dragon vehicle continues to follow the nominal rendezvous profile that supports an ISS capture tomorrow at 6:00 am CDT. 

Advanced Combustion via Microgravity Experiments (ACME) Electric-Field Effects on Laminar Diffusion (E-Field) Flames:  In preparation for the upcoming ACME E-Field Flames investigation the crew installed the ACME Mesh Positive Power Supply. The ACME investigation is a set of five independent studies of gaseous flames to be conducted in the Combustion Integrated Rack (CIR).  ACME’s primary goal is to improve fuel efficiency and reduce pollutant production in practical combustion on Earth.  For E-Field Flames an electric field with voltages as high as 10,000 volts is established between the burner and a mesh electrode. The motion of the charged ions, which are naturally produced within the flame, are strongly affected by a high-voltage electric field. The resulting ion-driven wind can dramatically influence the stability and sooting behavior of the flame. Conducting the tests in microgravity allows for great simplifications in the analysis, enabling new understanding and the development of less polluting and more efficient combustion technology for use on Earth.

Mouse Stress Defense:  To prepare for the transfer on Thursday of mice from the SpaceX-14 vehicle, the crew perform a pre-mission set up of the Mouse Habitat Cage Units for the Cell Biology Experiment Facility (CBEF).  They installed food cartridges, odor filters, water and filled up the washer fluid container.  The crew was unable to add water to 2 of the cage units.  Ground teams are investigating the issue.   Microgravity provokes cellular mechanical stresses and perturbs cellular signaling, leading to reduction of muscle and bone density. To overcome these stresses, one of the promising strategies is to activate Nrf2, a master regulator of antioxidant pathway. Mouse Stress Defense investigates how Nrf2 contributes to effective prevention of space-originated stresses.  

On-board Training (OBT) Dragon Robotics Onboard Trainer (ROBoT) Session 2: The crewmembers tasked with capturing Dragon completed their second, and final, OBT session using ROBoT. ROBoT is an on-orbit version of the ground-based Dynamics Skills Trainer (DST) that simulates robotics operations with graphical feedback. Today’s runs allowed the crew to practice Free Drift timing, malfunction response, and nominal rate approaches.   After the training session the crew had a conference with ground specialists where they discussed any final questions or comments related to capture and berthing operations. 

Today’s Planned Activities
All activities are complete unless otherwise noted.

  • Max Cycle Ergometer w/Vibration Isolation & Stabilization (CEVIS) Portable PFS Power Up
  • ALGOMETRIYA. Pressure and Thermal Algometry preparation for and measurement session
  • Replacement of ЗПЛ-1М2 (Ф-1, Ф-2) cartridges in СБМП (preparation)
  • Max Cycle Ergometer w/Vibration Isolation & Stabilization (CEVIS) Portable PFS Subject
  • VEGGIE Software On-Board Training
  • Demating ЗПЛ-1М2 (Filter-1, Filter-2) telemetry connectors from БКС
  • Replacement of ЗПЛ-1М2 (Ф-1, Ф-2) cartridges in СБМП
  • XF305 Camcorder Setup
  • Mouse Habitat Unit (MHU) Removal for Pre-mission Setup
  • Mouse Stress Defense Pre-mission Setup
  • ISS Crew Orientation
  • Combustion Integrated Rack Rack Doors Open
  • Combustion Integrated Rack Front End Cap Open
  • Wastewater Storage Tank Assembly (WSTA) Fill
  • FAZOPEREKHOD. Preparation steps and starting the experiment
  • ACME Hardware Replace
  • VEG-03 Dual Facility Watering for each Plant Pillow
  • On-board Training (OBT) Dragon Attached Phase Operations Review
  • СОЖ maintenance
  • Mouse Stress Defense Pre-mission Setup
  • IMS Update
  • Combustion Integrated Rack Front End Cap Close
  • FAZOPEREKHOD. Closeout Ops
  • Combustion Integrated Rack Rack Doors Close
  • Mate ЗПЛ-1М2 (Filter 1, Filter-2) Telemetry Connectors to БКС
  • Replacement of ЗПЛ-1М2 (Ф-1, Ф-2) cartridges in СБМП (Closeout Ops)
  • SPHERES Payload OBT
  • Max Cycle Ergometer w/Vibration Isolation & Stabilization (CEVIS) Portable PFS Partial Stow
  • SPHERES Crew Conference
  • INTER-MAI-75. HAM Radio Hardware Activation
  • ALGOMETRIYA. Strain Measurements Mode
  • MERLIN 5 Desiccant Swap
  • Checkout of ВСБ-95 Comm Panel in DC1, Telephone Communication System [СТСО] Test in DC1
  • External Wireless Instrumentation System (EWIS) Internal Antenna Move
  • On-board Training (OBT) Dragon Robotics Onboard Trainer (ROBoT) Session 2
  • On-board Training (OBT) Dragon Attached Phase Operations Review
  • Veggie Science Kit Locate
  • Wastewater Storage Tank Assembly (WSTA) Fill
  • Countermeasures System (CMS) Max Cycle Ergometer w/Vibration Isolation & Stabilization (CEVIS) Portable PFS Conclude
  • Health Maintenance System (HMS) Spaceflight Cognitive Assessment Tool for Windows (WinSCAT) Test
  • Dragon Vestibule Outfitting Hardware Gather
  • Dragon Rendezvous Operations Conference
  • Combustion Integrated Rack Hardware Return
  • Network Attached Storage (NAS) Hard Drive Swap
  • Ghost camera setup in Cupola
  • INTER-MAI-75. Equipment deactivation and cleanup
  • ABOUT GAGARIN FROM SPACE. Ham Radio Session with “The Leaders Club” Expedition
  • ALGOMETRIYA. Conducting measurements in tenso- and thermo-algometry mode

Completed Task List Activities

  • ESA Columbus Toolbox Cue Card Removal
  • USB Card Reader Swap
  • Dragon RPOP Setup 

Ground Activities
All activities are complete unless otherwise noted.

  • N2 ABCM Inspections
  • LAB MCA Calibration
  • CUCU Broadcast Test
  • CEVIS Spare Stowage Confirmation
  • Crew Recorded Message 

Three-Day Look Ahead:

  • Wednesday, 04/04: SpaceX-14 Capture and Berthing, SPHERES Run, Veggie03, Mouse Habitat Setup
  • Thursday, 04/05: Dragon Cargo Ops, Mouse Stress Defense, TangoLab 2 Install, TangoLab 1 Card R&R, POLAR Sample Xfr, MVP Install, NanoRacks Plate Reader2 Ops
  • Friday, 04/06: Veg03 Ops, Metabolic Tracking Setup, Mouse Stress Defense Ops, STP-H5 Imagery, Medical Contingency OBT, MVP Insertion Ops, Made-In-Space Setup, METEOR Ops  

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Operate

Carbon Dioxide Removal Assembly (CDRA) Node 3

Standby

Major Constituent Analyzer (MCA) Lab

Operate

Major Constituent Analyzer (MCA) Node 3

Standby

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Process

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off